Site commissioning covered mechanical and electrical pre-checks (piping, insulation, wiring, earthing, drains, comms, filters, labeling) followed by nitrogen pressure test, vacuum test, and functional run checks. Logged key operating readings and confirmed group control and scheduling on the controller prior to handover.
Challenges handled: Outdoor condensing units installed on a narrow building ledge.