EEG Aircon Singapore

Reduce upfront cost on commercial aircon replacement.

Coolflow helps eligible businesses in supported sectors plan energy-efficient aircon upgrades, prepare practical ACMV quotations, and check whether the project is worth exploring under EEG Base.

For eligible businesses in supported sectorsUp to 70% support for eligible SMEsCommercial ACMV replacement and upgrade support
Commercial aircon installation at a Singapore retail premises

Commercial Upgrade

Better cooling, lower energy waste, clearer project cost.

Fact-Checked EEG Summary

What EEG Base means for aircon upgrade planning.

The Energy Efficiency Grant helps businesses improve energy efficiency by co-funding investment in energy-efficient equipment. EEG Base supports pre-approved energy-efficient equipment up to S$30,000 per company.
EEG Base support cap Up to S$30,000 per company
Qualifying equipment Pre-approved energy-efficient equipment
Support rate Up to 70% for SMEs and up to 30% for non-SMEs until 31 March 2027
Application basis Subject to official eligibility criteria, applicant profile, equipment category, and prevailing grant terms

Current official references: EnterpriseSG EEG and NEA EEG.

Current Sector Framing

Eligible companies are assessed against official sector and applicant criteria.

  • Construction
  • Food Services
  • Manufacturing, including Food Manufacturing
  • Maritime
  • Retail
  • Users of data centres

Sector eligibility is based on official criteria such as ACRA registered SSIC code or sector-specific requirements. Do not assume all commercial premises qualify.

Practical Use Cases

Common aircon upgrade scenarios worth reviewing.

Retail outlet replacement

Replace weak or noisy shopfront cooling with a more efficient commercial setup and a clear equipment quotation.

Cafe or food-service cooling load

Improve comfort during peak trading hours while checking whether the replacement direction is worth assessing for EEG Base.

Restaurant aging system renewal

Plan around kitchen heat, dining area comfort, access constraints, and business downtime.

Fit-out or outlet refresh

Coordinate aircon renewal with ceiling, piping, drainage, access, installation, and commissioning requirements.

Manufacturing or commercial facility upgrade

Review business-premises cooling where the applicant profile and equipment category may fall within official EEG criteria.

Cost Illustration

See why checking early matters.

This example uses the EEG Base SME support rate as an illustration only. Actual support depends on official eligibility criteria, approved equipment, applicant profile, and prevailing grant terms.

Check My Project
Example eligible aircon equipment cost S$18,000
Illustrative support for eligible SME Up to S$12,600
Illustrative business outlay From S$5,400

Illustration only. EEG Base support is capped at up to S$30,000 per company and is subject to official criteria, supported equipment, application timing, and approval.

Equipment To Review

Aircon systems to check for EEG-supported upgrades.

Explore commercial aircon product pages that are commonly reviewed for replacement and upgrade projects. Final support depends on the current official supported equipment list, applicant profile, equipment category, and prevailing grant terms.
Daikin SkyAir Inverter
Daikin SkyAir

Daikin SkyAir Inverter

Daikin SkyAir Inverter systems are commercial unitary air-conditioning systems for shops, offices, and light commercial spaces...

Subject to official supported equipment list and prevailing EEG terms.

View product
Daikin VRV 6X
Daikin VRV

Daikin VRV 6X

Daikin VRV 6X Series outdoor units are built for high-capacity commercial VRV applications using R410A refrigerant, with a 6.0...

Subject to official supported equipment list and prevailing EEG terms.

View product
Daikin VRV 6A
Daikin Daikin VRV

Daikin VRV 6A

Daikin VRV 6A Series outdoor units are built for larger commercial VRV applications using R410A refrigerant, with an 8 to 78...

Subject to official supported equipment list and prevailing EEG terms.

View product
Mitsubishi Heavy Industries KXZ2 VRF
Mitsubishi Heavy Industries VRF

Mitsubishi Heavy Industries KXZ2 VRF

Mitsubishi Heavy Industries KXZ2 VRF-T heat pump systems are built for commercial and industrial VRF applications that need...

Subject to official supported equipment list and prevailing EEG terms.

View product

How Coolflow Helps

A practical contractor-side process before you commit.

Coolflow does not promise grant approval. We help with the commercial ACMV scope, equipment recommendation, quotation, and site execution planning so the project is properly framed before procurement decisions.
Request Site Assessment
  1. 01

    Understand site conditions, usage hours, comfort issues, and replacement priorities.

  2. 02

    Recommend suitable energy-efficient commercial aircon systems for the premises.

  3. 03

    Prepare a quotation with scope, equipment, and installation details.

  4. 04

    Guide you on grant-related documentation expectations before procurement commitments.

  5. 05

    Install, test, commission, and hand over the upgraded system after project approval.

Project References

Related business aircon projects.

These are Coolflow project references from the existing project library. They demonstrate commercial ACMV replacement, installation, coordination, and handover capability; they are not presented as grant-approved projects.
Jurong Point
Retail 2025

Jurong Point

Equipment
Daikin VRV 6A
Scope
Mall retail ACMV works coordinated around unit requirements, site access, and a presentable tenant-facing finish.
View project details
Greenwood Fish Market
F&B 2025

Greenwood Fish Market

Equipment
Mitsubishi Heavy Industries KXZ2 VRF
Scope
Restaurant ACMV works tailored to a dining environment where cooling reliability and customer-facing conditions matter.
View project details
City Sprouts
F&B 2025

City Sprouts

Equipment
Midea Atom VRF
Scope
EEG Grant to Supply and Install Midea MDV-V56WDHN1(SG2) 6 HP VRF System with 2 x 28,000 BTU Cassettes for a 600sqft restaurant...
View project details
ACS(I) Canteen
Commercial Installation 2025

ACS(I) Canteen

Equipment
Daikin VRV 6X
Scope
Canteen ACMV works involving on-site coordination, installation planning, and a handover suited to a food-service environment.
View project details

Why Choose Coolflow

Commercial aircon support with proof behind the pitch.

Coolflow works across business premises where cooling performance, site coordination, and handover quality matter.

BCA ME01 L1 Grade

Coolflow is listed on the site with BCA ME01 L1 Grade and focuses on commercial ACMV delivery.

Business premises across Singapore

Project references include F&B, retail, office, light commercial, and commercial installation work.

Major commercial brands

Daikin, Mitsubishi Electric, Mitsubishi Heavy, Midea, LG, and other commercial aircon systems.

Project handover capability

Site coordination, installation, testing, commissioning, and practical handover support.

FAQ

Fact-safe answers before you start an EEG aircon enquiry.

What is the Energy Efficiency Grant?

The Energy Efficiency Grant helps businesses improve energy efficiency by co-funding investment in energy-efficient equipment. EEG Base supports pre-approved energy-efficient equipment.

What support level is available?

For EEG Base, the support cap is up to S$30,000 per company. The support rate is up to 70% for SMEs and up to 30% for non-SMEs until 31 March 2027, subject to prevailing grant terms.

Which sectors are currently covered?

Official EEG sector framing includes Construction, Food Services, Manufacturing including Food Manufacturing, Maritime, Retail, and users of data centres. Eligibility is tied to official sector and applicant criteria.

Do all businesses qualify?

No. Support depends on official eligibility criteria, applicant profile, equipment category, project timing, and prevailing grant terms. The page should be treated as an enquiry starting point, not confirmation of approval.

What kind of aircon or equipment upgrades may be supportable?

EEG Base is for pre-approved energy-efficient equipment. For aircon replacement, the specific equipment and project details should be checked against the current official supported equipment list.

Does Coolflow help with quotation and project scoping?

Yes. Coolflow can assess the site, recommend suitable commercial ACMV equipment, and prepare a practical quotation with project scope details.

Do I need to buy first before applying?

Do not assume retrospective purchases will be supported. Official guidance notes that companies may not be eligible if procurement has commenced at the point of grant application.

How do I know if my project is worth checking?

If you are in a supported sector and are planning to replace aging or inefficient aircon, request an assessment before committing to equipment purchase or installation.

Next Step

Request an EEG upgrade assessment.

Tell Coolflow about your sector, premises, current aircon issue, and replacement needs. We will advise whether the project is worth checking further before you commit to procurement.

+65 3158 6557

Coolflow site survey and quotation planning

Grant support is subject to official eligibility criteria and approval. Coolflow can help with the aircon assessment, project scope, and quotation.